UMEME should replace old poles and bare electricity cables

0 have signed. Let’s get to 100!


The electricity distribution network in Uganda is very long overdue for overhaul as seen by the incident on Dewinton road in Kampala, where a tow tonne transformer fell on a moving vehicle due to the failure of the rotten poles that were supporting it.

This  situation is evident everywhere that the existing distribution mostly consisting of wooden poles is still in use.

Attempts at pole replacement and general improvement in the distribution network have all but been abandoned and the incident last week is an example of the effects that this will lead to. 



Today: Andrew is counting on you

Andrew Keto needs your help with “ERA - Electricity Regulatory Authority : UMEME should replace old poles and bare electricity cables”. Join Andrew and 77 supporters today.