Solar Power installation in Occidental Mindoro

0 have signed. Let’s get to 5,000!


Stable power supply in the province of Occidental Mindoro is a long overdue problem that has not been resolved. Or had the leaders really looking for the solution? Lots of opportunities are available around. Solar power was recently installed in Paluan. The northernmost, 3rd class municipality of the province who is always left behind and forgotten. They now have 24hour electric power supply, with very affordable rate perfect for the low income family. 

We are now seeking your cooperation in signing this petition to call our leaders to welcome the installation of Solar Power (headed by Mr Leandro Leviste).

We need at least 60% of the total population of Occidental Mindoro (487,000++ population as of 2015). 

Share this to as many people as possible and let them join us in this petiton.

Together we can make change.Change for the future of our children.