Cancel Project 3

Cancel Project 3

0 have signed. Let’s get to 100!
At 100 signatures, this petition is more likely to be featured in recommendations!
Awais Masood started this petition to Chakib Kara-Zaitri (University of Bradford)

It has taken too long for the materials to arrive for Multi-Discipline Engineering Project 3 for Year 1 students. Working in multi-discipline means that the time for working is very limited. According to the brief, there are only about a week and half remaining and the materials have just arrived.

We've had a lot of work in the same month. This includes Matlab assignments, Aspen Plus + CAD assignments. These assignments were in the same month, March. The project 3 was also announced in the same month.

We just finished these assignments to focus on our project 3 but the co-ordination between groups has been minimal due to the time-slots available and that we could not devise a proper design/concept due to materials arriving late.

If the materials had arrived earlier, we could have taken the measurements and created Solid-Works model designs. Therefore, we could not make small 3D parts for connections since we were unsure about the accurate measurements of several materials.

Although some of the groups have completed their design part of the project, it is highly unlikely to finish properly in time for the presentations. Therefore, this petition has been started to cancel the project. If not, then at least the build part can be cancelled and only the presentation is left.

Following is what most of us agree on:

  • Cancel Project 3 overall or the build part of the Project
  • Only Presentations like the Chem Eng Project 2
  • Extend deadline by 1-2 weeks

 