Build reliable new clean coal Power station

Build reliable new clean coal Power station

0 have signed. Let’s get to 100!
At 100 signatures, this petition is more likely to be featured in recommendations!
gavin Davis started this petition to Auststralian Government. Angus Taylor (energy minister)

Power plants around Australia are closing with nothing to replace them. It can take 4-5 years to build and if nothing is done now the power is and will be more costly and more blackouts. 

Already you can tell as there is petrol generators being sold as back up power in the future. Can you imagine if this becomes widespread with pollution. 

Solar and wind are not as good as claimed Waste after there lifetime is bad for the environment. 

https://www.smh.com.au/politics/federal/waste-crisis-looms-as-thousands-of-solar-panels-reach-end-of-life-20190112-p50qzd.html 

We need to do something now. Stop sitting on the fence.

OUR PRIMINISTER SAY IT BEST. SCOMO.

https://www.youtube.com/watch?v=ea5bOaPkZpc

0 have signed. Let’s get to 100!
At 100 signatures, this petition is more likely to be featured in recommendations!