    Please withdrew the expansion plan of Unit 3 of Sendai nuclear power plant

    Mr. Satoshi Mitazono, Governor of Kagoshima PrefectureMr. Kazuhiro Ikebe, President of KYUSHU ELECTRIC POWER CO., INC. (Along with serious doubts of advance construction of the addition of Unit 3) Please withdrew the expansion plan of Unit 3 of Sendai nuclear power plant. Currently, within the site of the Sendai Nuclear Power Plant, the protection forest is cut down and large-scale embankment construction work are in progress. Both Kyushu Electric Power Co. and Kagoshima Prefecture regard it as "Establishment of equipment storage place due to construction of coping facility for specific serious accident etc". However, when combined with the drawing of Unit 3 expansion plan, serious doubts emerged that seems to be a preliminary construction start of substantial Unit 3 expansion work in the following points. 1. The place where logging of the protection forest and embankment construction work is done is the planned place for logging at the time of addition of Unit 3 and it is the planned place of embankment construction work.2. Currently, the position of the sedimentation basin installed at the side of the embankment coincides with the position of the retention basin at the time of Unit 3 expansion.3. The position of the pipe arrangement from the sedimentation basin matches the position of the piping extending from the retention basin at the time of Unit 3 expansion.4. When Unit 3 is expanded, the first construction is the embankment construction work of the site. The construction period of this embankment construction work is 2 years and 9 months. In other words, if KYUSHU ELECTRIC POWER CO., INC. is going to begin full-scale construction of Unit 3, the construction term will be shortened by 2 years and 9 months. Regarding the plan to expand the Unit 3 of Sendai nuclear power plant, former governor Yuichiro Ito has announced that he will freeze administrative procedures for public sea reclamation permission and cancellation of the protection forest, following the Fukushima Daiichi nuclear accident in 2011. On April 27, 2017, Governor Satoshi Mitazono gave a decision to proceed with this protection forest cancellation procedure. Since the Fukushima No.1 Nuclear Power Plant accident, many prefectural residents are concerned about the existence of nuclear plants themselves. As there is a serious doubts of advance construction of the addition of Unit 3, if this construction is unrelated to the expansion plan of Unit 3, KYUSHU ELECTRIC POWER CO., INC. please withdrew the expansion plan, and Governor Mitazono please withdrew the agreement for expansion of former governor Ito in 2010. This signature does not matter for age, sex or country.Signature Handling Group: Try to stop Nuclear Power Plant! society of KagoshimaSignature aggregation destination: Anti-Nuclear Power Plant Kagoshima NetDeadline for signature: First March 31, 2019, Secondary May 31, 2019 ↓ Please see the photos and drawings from here.Logging of protection forest and site preparation work within Sendai Nuclear Power Plant site Japanese web page

    反原発・かごしまネット
    6 supporters
    Petitioning 反原発・かごしまネット 反原発・かごしまネット

    (3号機増設の事前着工の重大な疑義に伴い)川内原発3号機増設計画を白紙に戻してください

    鹿児島県知事 三反園 訓 様九州電力社長 池辺 和弘 様 (3号機増設の事前着工の重大な疑義に伴い)川内原発3号機増設計画を白紙に戻してください  現在、川内原発敷地内では、保安林を伐採し、大規模な盛り土工事が進行しています。九州電力、鹿児島県とも、「特定重大事故等対処施設建設に伴う資機材保管ヤードの造成」としていますが、3号機増設計画の図面と合わせてみたとき、進行中の工事は、以下の点で、実質的な3号機増設工事の事前着工ではないかとの重大な疑義が浮上しています。 1.保安林を伐採し、盛り土工事が行われている場所は、3号機増設時の伐採予定地であり、盛り土の予定地である。2.現在、盛り土の脇に設置してある沈砂池の位置が、3号機増設時の調整池の位置と一致する。3.沈砂池から伸びる配管の位置が、3号機増設時の調整池から伸びる配管の位置と一致する。4.3号機増設時、最初の工事が当該地の盛り土工事である。  今回の盛り土工事の工期は2年9カ月とされています。つまり、九電が3号機建設に本格的に取り掛かろうとするなら、2年9カ月工期が短縮されることになるのです。  川内原発3号機増設計画は、2011年の福島第一原発事故を受けて、伊藤祐一郎前知事が、公有海面埋め立て許可と保安林解除の行政手続きを凍結すると表明した経緯があります。2017年4月27日に三反園訓知事は、この保安林解除手続きを進める判断を下しました。福島第一原発事故以降、原発の存在そのものに、多くの県民が不安を抱いています。3号機増設工事の事前着工という重大な疑義が生じている以上、3号機増設計画とは無関係だというのであれば、九州電力は増設計画そのものを白紙に戻し、三反園知事は伊藤前知事の2010年増設同意を白紙撤回していただきたい。 この署名は年齢・性別・国籍を問いません。署名取扱団体:とめよう原発!かごしまの会署名集約先:反原発・かごしまネット署名締め切り:第一次 2019年3月31日、第二次 2019年5月31日 ↓写真、図面はこちらからご覧ください。川内原子力発電所敷地内における保安林伐採と敷地造成工事 英語ウェブページ

    反原発・かごしまネット
    576 supporters